Briefcase

Login Portal

+1.877.473.2008 | itsupport@trican.ca

Controlling water injection profiles not only leads to better production, but also saves money. To do this, each job requires a thorough investigation and a fit-for-purpose solution. We provide specially-designed viscous gels near the wellbore or farther into the formation to ensure the right water injection profile for the best results.

Check out Remedial Cementing for more information.

Remedial Cementing 

WCA-3™

WCA-3™ is a selective permeability modifier designed to effectively reduce brine water flow in the formation without...

View Details

PermBlock

PermBlock is a chemical water shutoff system that will permanently seal fractures and permeable rock/formations...

View Details

AQS-1™

Is a stable colloidal silicate solution that is used in the AquaSeal water shut off system

View Details